At the core of Shakeel Construction Company's success is a team of top of the line professionals and technicians, who work together on a project with smoothly coordinated efficiency. These include approximately 500 engineers, supervisors, and foremen, pipe fitters, electricians and erectors, who follow a job through with careful precision and thoroughness in every stage of fabrication and erection.

Structures Of Success

In the year since its inception Shakeel Conctruction Company has successfully completed several prestigious projects, in PAKISTAN, SAUDI ARABIA, UNITED ARAB EMIRATES, MALAYSIA, Lebanon, Syria, Iraq and SRILANKA.

SAUDI ARABIA

CLIENTS

Erection of 380 KV transmission line form Rabigh to Madinah Al Munawarah, consisting of 630 towers and involving 30,000 tons of tower components.

Erection of 380 KV transmission line form Rabigh to Makkah consisting of 339 towers and involving 10,000 tons of tower components.

Erection and stringing of 380KV double circuit transmission line form jeddah to Makkah, consisting of 87 towers of totally 3500 tons.

Erection and stringing of 132KV transmission line of Al-Qaseem Extension work Phase 3. (Line Length 220 Km.)

Foundation, erection and stringing of 33KV T/L and distribution Project for Al-Jouf Region.

UNITED ARAB EMIRATES

Erection, Stringing & Painting of 220 KV Double Circuit Zakher S/S to Sanaiya S/S Al-Ain, Abu Dhabi, U.A.Ε. Total Tower 20 & Total Length 10.9 km.

Erection, Stringing & Painting of 220 KV Al-Dhama S/S to Zakher J.P (tower lines) Al-Ain, Abu Dhabi, U.A.E. Total Tower 26 & Total Length 10.5 km

Erection, Stringing & Painting of 220 KV Al-Dhama S/S to Al-Hayat J.P Al-Ain, Abu Dhabi, U.A.E. Total Tower 11 & Total Length 4.2 km

Erection, Stringing & Painting of 400 KV Double Circuit OHTL Shahama East S/S to Al-Dhama S/S: Abu Dhabi U.A.E. Total Tower 311 & Total Length 140 km.

Foundation Tower Erection & Stringing of 33 KV OHTL complete with 33/11 KV Substation & Allied work at Jebel Dhana and Silla.

Erection & Stringing of 220 KV Double Circuit Double Bundle T/L comprising Foundations of 85 Towers along with Stringing of Conductor Al-Saad to Sweihan

Construction of 115 Foundations of towers, Erection & Stringing of 33 KV Double Circuit Single Conductor, Secondary T/L Ruwais To Gayathi.

Tower Erection work as a subcontractor on the 220 KV Double Circuit OHTL Project from Madinat Zated to Liwa & Mirfa to Madinat Zayed Erected about 170 Nos. of tower

Erection of Towers of 400 KV Shahama-Mirfa Overhead Transmission Line Abu Dhabi. U.A.E.

Tower Erection of 400 KV OHTL from Jebel Ali “G” Station to Sharjah Boundary. Dewa Tender No. CNE /286/95 Dubai, U.A.E

Electrical and Mechanical installations of Jebel Ali Power Project, “E” station extension Phase III, Dubai U.A.E.

Electrical and Mechanical installations of Mirfa Power & Desalination Plant, Contract No.3740/AA/70/SC/001 Mirfa Abu Dhabi, U.A.E.

Erection of Towers and Stringing of 400 KV Overhead Transmission Line Taweelah Abu Dhabi. U.A.E.

Syrian Arab Republic

Erection of Towers and Stringing of Conductor for 400 KV Over Head Transmission Line Projects in Syria Total length of lines 354 Km

Erection of 48 Nos. Telecommunication Microwave Towers. Height of Tower upto 100 Meter. Work includes Installation of Antenna System, Installation of Wave Guide, Installation of Obstruction Light and Allied External Equipment and Painting of Towers.
(Inter Cities and Rural Project Syria).
Working as Sub Contractor to M/S. Commerce And Engineering Consultants Damascus, Syria.

Erection of Towers and Stringing of Conductor for
400 KV OHTL’s for Syria – Turkey Interconnection
Project Syria.
Total length of line 358 Km.

Malaysia

Erection of Steel Towers and Stringing of 500KV Transmission Line(70KM) <br/>

PROJECT : 500 kv  Transmission System Development Line NO.7.

Erection OF 172 Towers of 500KV Transmission Line <br/>

 PROJECT 500KV Transmission System Development Line No. 1.

Erection of 116 Tower of 500KV  Transmission Line <br/>

PROJECT : 500KV Transmission System Development Line No. 1.

SRI LANKA

Construction of 123 KV OHTL. The Work Includes Construction of TowernFoundation, Erection of steel Tower and Stringing of Conductors.

Erection of Towers and Stringing of 220 KV
Kotmale-Anuradhapura Overhead Transinission
Line (Lot C) Project of Ceylon Electricity Board.
Sri Lanka

Construction of foundations, Erection of towers and Stringing of 132 KV Overhead Transmission Line.
Project of Ceylon Electricity Board. Sri Lanka.

PAKISTAN

Transportation and Erection of 220 KV Mangla to Kala Shah Kaku Double Circuit Transmission Line.

Transportation and Erection of 220 KV Terbela-Wah (Burhan) Double Circuit Transmission Line

Transportation and Erection of 380 Nos. Towers of 500 KV Terbela-Lyallpur Transmission Line (South Section).


Construction of Tower Foundations, Erection of Tower and Stringing of Conductor of 132 KV Transmission Line Loops.

Diversion of New Karachi 132 KV Transmission Line.

Rehabilitation of 132 KV Transmission Lines Karachi (21 miles).


Construction of Tower Foundations, Erection of Towers and Stringing of Conductor for 220 KV Terbela-Mardan Transmission Line (90 Km).


Survey, Foundation, Erection, Stringing and Testing of Saidu Sharif-Chakdara-Dargai 132 KV Transmission Line (80 Km).


500 KV Transmission Line Project WAPDA Kot Chutta-Guddu Section, comprising of construction of 456 conventional foundations, 29 pile foundation, erection of 475 Towers and stringing of 190 Km Quad Bundle Drake conductor and Two Shield Wires.

Contract No. 824-105 (Lot-1) for Survey. Erection, Testing and Commissioning of 220 KV Double Circuit Lahore 500 KV Ravi Transmission Line.


Erection of Electromechanical Equipment concerning the following components for a total weight of 4800 tons for Kot-Addu Gas Turbine Power Station

a). Two Gas Turbine, Steel Stacks, Air and Gas Ducts

b). Two generator units, 100 MW.

c). Mechanical Auxiliary System (Fire-Fighting System, Compressed Air system, Bridge Crane Fuel System, etc.)

d). Two 100 MW unit transformers, onc 20 MVA start up transformers.

e). Medium and Low Voltage Boards, Control Desks, Electrical Equipment, Electrical Cables for main, Auxiliary, Control, Instrumentation Systems.

f). A 132 KV substation consisting of 22 bays.

Ware House Building with all supply systems for Water and Electricity and Sewerage system at Bin Qasim Thermal Power Station, Unit No. 3 & 4, Lot B.

Electro-Mechanical Erection Works For Bin Qasim Power Station On Unit No.3 & 4 Comprising:

a). Laying Of Bonna Steel Cylinder Pipes (Dia, 2 Meter).

b). Erection Of Pump House, Screening Plant And All Auxiliaries.

c). Erection And Fabrication Of Piping Supports. d). Erection Of Electric Works. Including Erection Of Cables, Cables Conduits, Primary And Secondary Instrumentation Of Boilers.

e). Installation Of Panels.

f). Erection of Pipes And Pump House.

g). Erection of Crane Bearn.

h). Lighting of Equipment,Earthing of Lightening Arresters For The Plants.

i). Lighting, Communication and Fire Alarm System.

j). Installation of Telephone/Clock, Loud Speaker/T.V Camera.

k). Miscellaneous Work.

Installation of 132/66 KV Grid Station Equipment for M/s. Hazara Urea Fertilizer Limited

Electromechanical Installation, Insulation, Painting and Erection of Control, etc. of Bin Qasim Thermal Power station Unit No. 3 & 4, Lot C & D Project, Karachi, Pakistan.

Mechanical and Electrical Work of Erection related to construction of the 1292 MW Thermal Power Plant, Hubco Order No. APK / 652/95 dated 31.08.1995 Karachi, Pakistan.

Transportation and Erection Karachi to Muzaffargarh 18 Nos. Microwave Towers 360′ to 450′ High, Including Antenna System Feeder Network. Parabolic Dishes and Bridge Supports along with the painting of Tower and Fixation of Obstruction Lights (For PARCO Telecommunication System).

Construction Of Microwave Tower, Foundations and Erection of Microwave Towers 80′ To 465′ High Including Antenna System Feeder Network Parabolic Dishes and Bridge Supports along with the painting of Towers and Fixation of Obstruction Lights (Railway’s Telecommunication & Signaling Project) Pakistan Wide.

Erection of 10 Nos. Microwave Towers for Mardan Chitral Microwave Link upto the height of 465′ Including Antenna System Feeder Network, Parabolic Dishes and Bridge Supports along with the painting of Tower and Fixation of Obstruction Lights and Wave Guide.

Laying of Cables, Wave Guides, Termination of Cables, Installation of Communication Equipment, Antenna Drive and Servo Control System, Station Facility and Microwave Line System on Satellite Earth Station Project, Islamabad.

Construction of Microwave Tower Foundation, Complete Erection of Microwave Towers, Painting of Towers, Installation of Antenna’s Wave Guides and other Allied Equipment of 27 No. Stations Karachi-Quetta Microwave System Project.

Complete Erection of Guyed Tower, Installation of Microwave and UHF Antenna’s Wave Guide, Obstruction Lights and Allied Equipment for Pakistan Railways Telecommunication and Signaling Project at Pir Ketpar Sight No. 3901.

Erection of Jamal Din Wali (Rahim Yar Khan) 720′ High Guyed TV Tower Antenna System Feeder Network. Parabolic Dishes and Bridge Supports along with the Painting of the Tower and Fixation of Obstruction Lights.

Erection Of Noorpur (Hyderabad) RBS 720 High Guyed Tower, Antenna System Feeder Network, Two Parabolic Antennas and Bridge Support along with the Painting of the Tower and Fixation of Obstruction Lights (For PTV).

Shifting and Installation of Machinery from ald production hall to new manufacturing facilities.

Unloading and Erection of 45′ High and 42 Ton Heavy Air Separation Unit on its Foundations.

Power Installation of Pakistan Railway Concrete Sleeper Factory, Shaheenabad, Sargodha.

Certificates of the Projects Successfully Completed

Completion Certificates of Power House Projects
Completion Certificates of Overhead Transmission Line Projects
Completion Certificates ofMicrowave Telecommunication and T.V Tower Projects
Completion Certificates of Industrial Transmission Production

ANEVOLVING FUTURE

Expansion, consolidation, an enlarging of the operational base, updading techniques and processes to keep with new trends in power and industry are all on the agenda for the future. A redefinition of engineering and technical capabilities to execute bigger projects on a larger scale, with a subsequent shift into more high-profile projects is also envisaged; with an evolving of the company's corporate identity to meet requirements for power and industrial projects execution in the wider international market.

Erection and stringing of transmission lines

Quality has always been a journey and not a destination.

POWER TRANSMISSION AND DISTRIBUTION IMAGE GALLERY
Company IMAGE GALLERY